Get the amount for the change output after paying needed fees.
Synopsis
Description
The change amount is not 100% precise due to discrepancies in fee calculation. The final change amount (if any) should be corrected after calculating the final tx fees. When there is a discrepancy, most of the time the final change would be slightly bigger than estimated.
Following are the possible factors of discrepancy: + non‐input fees always include segwit flags + input fee estimation always include segwit stack size + input fees are rounded individually and not collectively, which leads to small rounding errors
-
input counter size is always assumed to be 1vbyte
Return Value
Amount for change output, 0 when there is no change.
Parameters
Name |
Description |
min_viable_change [in] |
Minimum amount for change output, if change would be less then we forgo change |
change_fee [in] |
Fees to include change output in the tx |
Created with MrDocs