Load month‐day schedule dates into the specified schedule.
Synopsis
Declared in <bblb_schedulegenerationutil.h>
static
void
generateFromDayOfMonth(
bsl::vector<bdlt::Date>* schedule,
bdlt::Date const& earliest,
bdlt::Date const& latest,
int exampleYear,
int exampleMonth,
int intervalInMonths,
int targetDayOfMonth,
int targetDayOfFeb = 0);
Description
Load, into the specified schedule, the chronologically increasing sequence of unique dates that are on the specified targetDayOfMonth (or the last day of the month if targetDayOfMonth would be past the end of the month), integral multiples of the specified intervalInMonths away from the specified exampleYear and exampleMonth, and within the specified closed‐interval `[earliest, latest]`. Optionally specify targetDayOfFeb` to replace `targetDayOfMonth whenever the month of a schedule entry is February. The behavior is undefined unless earliest <= latest, `1 <= exampleYear <= 9999`, 1 <= exampleMonth <= 12, 1 <= intervalInMonths, 1 <= targetDayOfMonth <= 31, and `0 <= targetDayOfFeb <= 29`.
Parameters
Name |
Description |
schedule |
receives the generated date sequence |
earliest |
inclusive start of the date window |
latest |
inclusive end of the date window |
exampleYear |
reference year for the interval lattice |
exampleMonth |
reference month for the interval lattice |
intervalInMonths |
spacing between schedule months |
targetDayOfMonth |
desired day of month (clamped to month length) |
targetDayOfFeb |
optional February day override; 0 means unused |
Created with MrDocs